Wisconsin Mount Pleasant Homepage
Search
News Flash Home
The original item was published from 3/21/2025 2:24:32 PM to 4/1/2025 9:37:44 AM.

News Flash

Village News

Posted on: March 21, 2025 | Last Modified on: March 21, 2025

[ARCHIVED] PRESCRIBED BURN ALONG PIKE RIVER PATHWAY

Image of a prescribed burn sign

The Village of Mount Pleasant has contracted a private environmental consulting firm to conduct controlled (prescribed) burns of the vegetation along the southern end of the Pike River corridor between Braun Road and CTH KR on the west bank of the Pike River Pathway.

Between March 24, 2025, and May 15, 2025, Resource Environmental Solutions, LLC (RES) will conduct this burn. Several weather parameters need to fall into alignment for this burn to take place, including wind direction, wind speed, air temperature, and relative humidity. For this reason, no more than a 24-hour notice will be provided to the Village or local residents. This burn will take several hours to complete and may be conducted on different days.

Public safety during the execution of these burns is of paramount concern. The Pike River Pathway along the burn area, specifically in Phases 8 and 9 of the pathway, will be posted as closed while the burn is being conducted. Resource Environmental Solutions, LLC is working in conjunction with officials from the Mount Pleasant Fire, Police, and Engineering Departments to ensure these burns meet ecological goals and minimize risks to public health and safety.

For questions regarding the prescribed burn, please contact Village Hall at (262) 664-7800. 

View a map (PDF) of the prescribed burn area. 
Find additional information on our Storm Water Drainage Utility webpage

Facebook Twitter Email

Other News in Village News

Wheelbarrow full of grass clippings.

COMPOST SITE OPENS FOR THE SEASON

Posted on: March 27, 2026
Red, white and blue vote buttons.

IN-PERSON ABSENTEE VOTING

Posted on: March 19, 2026 | Last Modified on: March 17, 2026

METRONET UTILITY PROJECT FAQ

Posted on: November 17, 2025
Image of a road with Orange Barrels

WIS 31 RECONSTRUCTION PROJECT

Posted on: November 10, 2025 | Last Modified on: November 10, 2025
Laptop with a screen that reads Subscribe.

STAY CONNECTED WITH US

Posted on: January 24, 2025
  1. Mount Pleasant, Wisconsin

Contact Us

  1. 8811 Campus Drive
    Mount Pleasant, WI 53406
    Ph: 262-664-7800
    Fx: 262-664-7801


    Village Hall Hours
    Monday thru Friday
    8:00 AM to 5:00 PM


    Friday
    First full week of May through the last full week of September
    8:00 PM to 1:00 PM


    Court Office Hours

Government Websites by CivicPlus®
Arrow Left Arrow Right
Slideshow Left Arrow Slideshow Right Arrow